How do you connect a new 5MW heating and 6MW cooling link to an operational energy centre without shutting it down?
For one mechanical and electrical (M&E) contractor, the answer involved developing a method to hold a stable ice plug in 400mm pipework while the energy centre kept running.
It was one of seven projects in an R&D tax relief claim prepared by UHY Williamson Croft for the company’s year ended 31 July 2025. With £377,114.57 of qualifying costs, the claim gives an illustrative net corporation tax benefit of £56,567.18 under the merged R&D scheme, assuming the 25% main rate applies.
The client: a mechanical and electrical contractor
The company is a design-and-build M&E contractor delivering integrated building services for energy centres, district energy schemes, residential developments and student accommodation. We have anonymised the client.
The engineering problems behind the claim
Three of the seven projects show the sort of problem involved.
Connecting new infrastructure to a live energy centre
The contractor had to connect a new 5MW heating and 6MW cooling link to an energy centre that had to stay in operation.
Pipe freezing is an established technique: an ice plug temporarily isolates the water in a system so that repairs or modifications can be made without draining or shutting it down. Equipment makers describe their standard kit as freezing stationary water, and pipe diameters above 8 inches can call for liquid nitrogen temperatures to create a pressure-bearing plug. This pipework was 400mm, about 16 inches, and part of a live system. The R&D was the work of developing a method that held a stable plug in those conditions. These are general descriptions of the technique, not of the company’s own method.
A temporary energy centre for a heat network serving around 900 homes
The second project was a temporary energy centre for an ambient-loop heat network serving around 900 homes. Ambient-loop networks connect a heat pump at each building to a loop carrying water at near-ambient temperatures, generally 10°C to 25°C, rather than sending hot water to every connection, and the loop can pass heat between buildings that need heating and buildings that need cooling.
The contractor’s temporary energy centre used cascaded air source heat pumps and bespoke controls. No proven method existed for working within the project’s live, operational constraints, so the contractor developed its own.
A dual-mode heating system for a refurbishment
The third project was a dual-mode heating system for a refurbishment. It had to be ready to connect to a heat network whose own design did not yet exist. Preparing for a future connection is not R&D in itself. It qualified here because no proven method existed for designing a system to these constraints.
What qualifies as R&D in construction and engineering
R&D for tax purposes is not confined to laboratories. A project qualifies where it seeks an advance in science or technology by resolving uncertainty, and HMRC’s manual says that uncertainties a competent professional working in the field can readily resolve do not count. In practice, a project may qualify where:
- existing technology or methods could not readily deliver the result
- a competent professional could not readily see how to resolve the uncertainty
- the work involved design, testing or analysis aimed at resolving it
HMRC expects the view of a competent professional on whether an advance was needed. It also says an R&D project can contain sub-projects, and that the advance being sought determines the scope of the project.
A project that is complex, commercially demanding or new to a contractor but can be delivered with established methods falls outside the relief. The work does not have to succeed, though. HMRC’s manual says that even if the advance sought is not achieved or not fully realised, R&D still takes place.
The claim in figures
| Qualifying cost | £ | % of total |
| Staff | 70,218.54 | 18.6% |
| Subcontractors | 155,600.02 | 41.3% |
| Consumables | 145,342.42 | 38.5% |
| Software | 5,953.58 | 1.6% |
| Total | 377,114.57 | 100% |
The company’s year began on 1 August 2024, so the claim falls under the merged scheme, which applies to accounting periods beginning on or after 1 April 2024. The scheme gives a taxable expenditure credit of 20% of qualifying costs, which is £75,422.91 here. At the 25% main rate of corporation tax, £18,855.73 of that credit is taxed, leaving a net benefit of £56,567.18, or 15p for every £1 of qualifying spend.
Qualifying costs go beyond in-house staff time
Subcontractor and consumable costs together make up just under 80% of the qualifying costs. Both need careful treatment on a contracting claim.
Subcontractor costs
The merged scheme’s contracting-out rules apply to accounting periods beginning on or after 1 April 2024. The government’s technical note says the aim is to allow the decision maker to claim for R&D contracted out. For payments to unconnected contractors, HMRC’s manual says 65% of the relevant portion of the payment is claimable. The work must also take place in the UK: HMRC’s draft guidance says R&D is undertaken in the UK to the extent that the activities actually take place in the UK. The subcontractor figure in the table is the amount reported as qualifying in the claim.
Materials and consumables
HMRC defines consumable items as things used up in the R&D project, such as fuel, materials, chemicals, power and water. You cannot claim the costs if you sell or transfer ownership of the items used up in the R&D. On a construction project, that means separating materials used up in trials and testing from materials that become part of a building the client owns.
Could your construction or engineering projects qualify?
Contractors responding to decarbonisation and energy efficiency requirements are meeting technical problems that established methods do not always cover. Areas where qualifying work may arise include:
- integrating renewable and low-carbon energy technologies
- developing heating, cooling and ventilation systems
- adapting infrastructure within live operational environments
- developing new construction or installation techniques
- integrating complex building services and controls
- improving the performance or reliability of existing technologies
Eligibility depends on the advance a project sought and the uncertainty it had to resolve, not on the type of project or technology. Keeping technical and financial records from the start makes a claim easier to support. HMRC says that an opinion on whether a project qualifies needs to set out facts and reasoning, because a simple assertion that the project qualifies as an advance will not be enough.
R&D tax relief advice for construction and engineering businesses
UHY Williamson Croft helps construction, property, engineering and technology businesses assess whether their projects qualify and prepares R&D tax relief claims. We work from offices in Manchester and Liverpool.
If your business has solved technical problems that established methods could not readily resolve, we can help you decide whether a claim is worth pursuing. Contact Pavel Stupin, R&D Director, or Taylor Rogers, Partner, to discuss your projects.
Frequently asked questions about R&D tax relief for construction and engineering businesses
Can mechanical and electrical contractors claim R&D tax relief?
Yes, where the work seeks an advance in science or technology by resolving an uncertainty a competent professional could not readily resolve. Routine design, installation and maintenance would not normally qualify.
Can construction companies claim R&D tax relief for work done for clients?
Potentially. The merged scheme’s contracting-out rules are designed to let the decision maker claim, so the answer turns on who decided to carry out the R&D and how the contract is structured. Each contract needs reviewing on its own facts.
Can construction companies claim R&D tax relief for work done for clients?
Potentially. The merged scheme’s contracting-out rules are designed to let the decision maker claim, so the answer turns on who decided to carry out the R&D and how the contract is structured. Each contract needs reviewing on its own facts.
Can heat pump and heat network projects qualify?
Yes, where the work meets the definition of R&D, for example resolving uncertainty in system integration, performance or installation methods. Routine installation of established technology would not normally qualify.
Can subcontractor costs be included in a claim?
Yes, subject to the contracted-out R&D rules and the UK restriction. For unconnected contractors, 65% of the relevant portion of the payment is claimable.
How much R&D tax relief can an engineering company claim?
Under the merged scheme the credit is 20% of qualifying costs and is taxable, so a company paying corporation tax at 25% nets 15p for every £1. If a credit exceeds the PAYE cap, the excess is carried forward to the next accounting period.
About this case study: the expenditure figures are as reported in the claim prepared by UHY Williamson Croft. The net benefit is illustrative. It assumes the company pays corporation tax at the 25% main rate (profits above £250,000), and the actual benefit depends on the company’s tax position, the expenditure credit payment rules, any applicable PAYE cap, the eligibility of the expenditure and HMRC accepting the claim.